For electrical and M&E subcontractors · Ireland and UK
Handover paperwork, ready for your tester to sign.
Send your board and cable schedules. Get back pre-populated test packs, an ITR register and a compiled O&M file, at a fixed price, without taking an engineer off site.
Request a sample / quoteReply within one working day. Everything is handled by email. View the sample pack (PDF).
| Way | Circuit | OCPD | mm² | R1+R2 Ω | IR MΩ | Zs Ω |
|---|---|---|---|---|---|---|
| 1 | Lighting, aisles 1–4 | B 10 | 2.5 | 0.71 | >299 | 0.86 |
| 2 | Lighting, aisles 5–8 | B 10 | 2.5 | |||
| 6 | Sockets, offices | B 20 | 4.0 | |||
| 8 | Dock leveller DL-01 | C 16 | 2.5 | |||
| 12 | Sub-main SM-002 | 100 A | 35 |
What gets prepared
Built from your documents, in your template, the main contractor's required format, or ours. Layouts are arranged to suit IS 10101 / BS 7671 verification records.
Test packs
- Test record sheets: insulation resistance, continuity, polarity, phase rotation
- Circuit test schedules with design data filled in
- Torque logs
- Point-to-point check sheets
ITR / asset register
- Every asset against every required document
- Status tracking from prepared to accepted
- Summary tab with live counts
- Query list of gaps in your source information
O&M / handover file
- Asset schedule
- Test certificate index
- Maintenance schedule from supplied manufacturer literature
- As-built document register and transmittal
Why subcontractors use it
Main contractors commonly hold sign-off and retention until handover documentation is complete and accepted. The paperwork usually falls to the people who are busiest on site.
What you get
- Prepared by an experienced electrical commissioning professional
- Fixed price agreed before work starts
- No site visits, calls or daytime meetings needed
- Inconsistencies between schedules and drawings flagged before they reach site
What this is not
- Not a certification or testing service. No testing, inspection or site attendance.
- No certificates issued or signed. Your competent person verifies every pre-filled value, tests and signs.
- No design or design checking.
- No guarantee of acceptance by a main contractor or client.
How it works
Asynchronous by design. You send files when it suits; packs come back by email.
- Send inputsBoard schedules, cable schedule, single-line drawings, numbering convention, and your template if you have one.
- Fixed quoteReturned within one working day, with any queries on the source information.
- Draft packPrint-ready and fillable PDFs plus the register. One round of revisions included.
- CompileOptionally, scan back signed sheets and they are compiled into the handover file.
Launch pricing
All prices ex VAT. Turnaround runs from receipt of complete inputs.
Single board pack
3 working days
One distribution board (up to 24 ways) plus up to two sub-main cables: test record sheets, circuit schedule, torque log, point-to-point sheet.
Multi-board package
5–10 working days · scoped and fixed before start
Typically 6–20 boards with associated cables: all test packs, ITR / asset register and query list.
O&M compile
5–10 working days from receipt of records
Index, asset schedule, test certificate index, maintenance schedule and document register, compiled from your signed records and supplier literature.
Larger or unusual scopes are quoted individually. Terms of engagement are issued with every quote.
See it on one of your own boards
Email one board schedule (redacted is fine) and get a sample pack back, or ask for a fixed quote on a full package.
Request a sample / quotehello@sennabrook.com